Location: Western Washington
Client: Eastside Software Developer
Architect: Callison
General Contractor: Sellen Construction
Mechanical Contractor: University Mechanical
One Lab
Over 57, 000 square feet (including generator buildings, switch yard and mezzanine). The building’s cooling method uses outside air with evaporative coolers. Number of Pods: 48 Pods (8 Clusters of 6 pods) separated into two groups of 24 on either side of a central control/work area. ATS, as part of the project team, designed, built, and commissioned the Alerton controls for the innovative mechanical systems for this project. ATS provided Electrical System monitoring via a combination of MODBUS integration and hardwire interface to Electrical Gear.